Sherman
Data Center
Israel
6.5 MWh

Sherman

AGEERA

Project developed together by Blazar Energy and AGEERA, strategic partners in the design, installation and operation of battery storage.

Mission-critical data center energy storage with ultra-fast backup response

Project Overview

Sherman data center deployment features a robust 6.5 MWh battery system designed for mission-critical operations. With sub-second backup activation and advanced power conditioning, the installation ensures uninterrupted operations while reducing energy costs through intelligent load management.

Key Benefits

  • Ultra-fast backup activation for critical IT loads
  • Reduced cooling and infrastructure costs
  • Enhanced power quality and reliability
  • Participation in capacity markets
  • Optimized renewable energy integration

Technical Details

Storage Capacity
6.5 MWh
Technology
Data center-grade BESS
Control System
Mission-critical EMS with redundancy
Backup Speed
<100 milliseconds
Reliability
99.999% uptime design

Performance Results

-35%
Infrastructure Costs
Reduction in UPS and backup systems
-27%
Energy Costs
Overall power expense savings
99.999%
Uptime
Operational availability