


Project developed together by Blazar Energy and AGEERA, strategic partners in the design, installation and operation of battery storage.
Mission-critical data center energy storage with ultra-fast backup response
Sherman data center deployment features a robust 6.5 MWh battery system designed for mission-critical operations. With sub-second backup activation and advanced power conditioning, the installation ensures uninterrupted operations while reducing energy costs through intelligent load management.